Quality

Quality inspections, non-conformances and actions across processes

The ERPNext Quality module integrates quality inspections into goods receipt, manufacturing and delivery. Results, deviations and actions are documented directly on the document. This creates a traceable basis for audits and certifications such as ISO 9001.

Inspection templates and parameters

Inspection templates define what is checked: parameters with target values, tolerances or formulas, numeric or pass/fail. The template can be set on the item and is then suggested for every inspection.

Inspections in the process

The item defines whether inspection is required before purchase, before delivery or in manufacturing. Without a completed inspection, the document cannot be submitted. Rejected quantities go to a separate warehouse. Damage can be documented per line with a description and photo, and the purchase order stays open until the full accepted quantity has arrived.

Non-conformances and actions

Deviations are recorded as non-conformances with cause and corrective action. Quality goals, reviews and meetings document quality management in the same system.

Traceability and certificates

With batches and serial numbers you can trace which supplier a material came from, which order consumed it and which customer received it. Supplier batch, material certificate or test report can be stored on the batch. Quality procedures document processes in the system, and every change to a document is logged with user and timestamp.

Complaints and supplier rating

Customer complaints can be recorded with a reason and turned into a sales return or credit note. Defective deliveries go back to the supplier as a purchase return. The supplier scorecard weights criteria such as price, quality and delivery performance, so suppliers can be classed as preferred or critical, for example, and flagged in purchasing.

Reporting

Reports show inspection results per item, supplier or period. Recurring problems and weak suppliers become visible.


How it connects to other modules
  1. Buying: Inspection at goods receipt, rejection to the supplier.
  2. Manufacturing: Inspections during and after production.
  3. Stock: Blocked and rejected goods in separate warehouses.
  4. Selling: Inspection before delivery.


Frequently asked questions

How does inspection at goods receipt work? If incoming inspection is required for the item, it is created from the purchase receipt. Rejected quantities are posted to a rejected warehouse and can be returned to the supplier.

Can inspection be mandatory? Yes. If inspection is required on the item, the receipt, delivery or production entry can only be submitted after the inspection is completed.

Can inspection happen during manufacturing? Yes. Inspections can be required on the BOM, on job cards and on the production entry.

Can sampling be handled? Yes. The inspection includes a sample size, and retain samples can be kept for batch-tracked items.

Does ERPNext support ISO 9001? ERPNext provides the tools: inspections, non-conformances, actions, goals and reviews. Certification itself depends on your processes.

Can batches be traced through to the customer? Yes. For batch-tracked items you can see which supplier a batch came from, where it was consumed and which customers received it. In case of a recall, affected customers can be identified quickly.

Can material certificates be stored on the batch? Yes. Certificates and test reports can be attached to the batch and stay linked to it across all stock movements.

How are complaints handled? Customer complaints can be recorded with a reason and processed as a sales return or credit note. Complaints to suppliers run through a purchase return. Recurring causes can be recorded as a non-conformance with corrective action.

Can suppliers be rated on quality? Yes. The supplier scorecard rates suppliers regularly on criteria such as quality, delivery performance and price. Weighting and calculation can be adapted to your own purchasing.